Compliance guide

EPC Rules for Landlords: Getting to C by 2030

86,000+

landlords, agents and tenants

Every tool, every tier

ORBIT, AI Document Studio, RRA Compliance Checker

From £149 per year

Annual membership

One free RRA audit

Following registration

The current minimum for covered private rentals in England and Wales is EPC E unless a valid exemption applies. Government intends a higher standard (EPC C on new EPC metrics) by 1 October 2030. Use the announced metrics and cost cap for planning pending legislation. The announced cost cap is £10,000 per property, counting work from 1 October 2025. The legal minimum today remains EPC E. The 2030 regulations have not yet been laid.

Updated 2 November 2026. Applies to England and Wales unless stated.

This page covers England and Wales, where the same minimum energy efficiency standards (MEES) apply. Scotland runs its own EPC and energy rules and is not covered here.

Four years is less time than it sounds. Surveys, contractor availability, tenant access and any planning consent all take time. Landlords who plan from today can phase the work, use grants and avoid paying peak prices in 2029 and 2030.

The rules today: EPC E minimum

Under the Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015, a private rented home must have an EPC of at least E. Properties rated F or G are sub-standard. Since 1 April 2020 this has applied to all relevant tenancies, not just new lets.

The current cost cap and exemptions

Where a property is below E and no third-party funding is available, the current cap on landlord spending is £3,500 including VAT. It covers the total spend, not each measure.

If you have made all relevant improvements up to the cap and the property is still below E, you can register an exemption on the PRS Exemptions Register. Exemptions must be registered to count.

EPC basics

  • You need a valid EPC before you market a property to let.
  • The eventual tenant must receive a copy free of charge.
  • Adverts in commercial media should show the energy rating.
  • An EPC lasts 10 years and can be reused across lets during that time.
  • Trading Standards can issue a £200 fixed penalty for EPC marketing failures.

If a property is not legally required to have an EPC, the minimum standard does not apply to it. Our planned guides to current MEES rules and EPC validity go further.

The 2030 standard: what the government has confirmed

On 21 January 2026 the government published its response to the consultation on improving the energy performance of privately rented homes. The headline points are confirmed policy, but they are not yet law.

ElementConfirmed policy
StandardEPC C, measured on new EPC metrics
Deadline1 October 2030 for all private tenancies, new and existing
ScopeEngland and Wales; short-term lets excluded for now
Cost cap£10,000 per property, described as a maximum over 10 years
Spend that countsRelevant measures installed on or after 1 October 2025
Low-value propertiesCap of 10% of property value where lower than £10,000 (properties under £100,000)
Existing C ratingsEER C or above before 1 October 2029 stays compliant until that EPC expires or is replaced
PenaltiesUp to £30,000 per property, per breach
LegislationNew primary legislation first, then regulations aimed to come into force in 2027

The higher £30,000 penalty, new enforcement powers and the requirement for a new EPC before works all need fresh primary legislation. Penalties will also apply to false or misleading information on the PRS Exemptions Register. Lettings agents and platforms will not be required to advertise only compliant properties at this stage.

The consultation had proposed an earlier 2028 date for new tenancies. The government dropped it, so every tenancy works to the same 2030 deadline. Our planned EPC C 2030 guide tracks the legislation as it progresses.

New EPC metrics: what “C” will mean

The 2030 standard will not use the single A to G energy efficiency rating that landlords know today. It uses two tests.

  1. Primary standard: a fabric performance metric, which measures how well the building holds heat.
  2. Secondary standard: either a smart readiness metric or a heating system metric, at the landlord’s choice.

Properties that cannot receive any recommended smart readiness measures do not have to meet the heating system standard. The exact C threshold on the new EPCs has not been confirmed. It depends on final EPC reform and outputs from the Home Energy Model.

The government said in January 2026 it aimed to deliver new EPCs from October 2026, and described that timetable as ambitious. Our planned new EPC metrics guide explains each measure.

Why an EPC C before October 2029 matters

If your property is rated C or above on the current Energy Efficiency Rating before 1 October 2029, it counts as compliant until that EPC expires or is replaced. If you are close to C now, getting the work done and a fresh EPC lodged before that date could give you up to 10 years of certainty.

Landlords without a qualifying C will need a new EPC before works and a post-retrofit EPC to show compliance.

The £10,000 cost cap in detail

The government estimates average spend at around £5,400, well below the cap. The cap is a maximum, not a target.

  • Counts towards the cap: third-party funding such as Warm Homes: Local Grant and ECO4, post-retrofit and reasonable EPC costs, and some specialist retrofit advice.
  • Does not count: Boiler Upgrade Scheme grants.
  • Start date: qualifying measures installed on or after 1 October 2025.

A portfolio-based cap is being explored but has not been confirmed. Our planned guide to cost cap and exemptions will cover the detail when legislation is published.

Exemptions under the 2030 standard

Exemptions will be measure-specific. Using one does not excuse you from installing other relevant measures within the cap.

ExemptionWhen it appliesValidity
High costThe cheapest recommended measure exceeds the cap5 years
All relevant improvements madeNo further improvements possible5 years
Cost capCap reached, or the next measure would exceed it10 years
Property value adjustmentLower cap for properties under £100,00010 years
Solid wall insulationLandlord opts not to install it5 years
Negative impactsMeasures that would harm the property, including devaluation10 years
Third-party consentTenant, superior landlord or planning authority refuses consent5 years
New landlordBuying a property with tenants in situ6 months

Listed buildings and those in conservation areas need particular care. Our planned listed buildings guide will cover how the rules apply.

See which properties need work first

ORBIT gives every property a health score that brings EPC rating, expiry date and certificate status together on one timeline. You can see at a glance which homes sit below C, which EPCs expire before 2029 and where to direct your budget first. Enter certificate expiry dates in ORBIT and configure reminders.

See ORBIT property health scores

Your EPC C plan: a practical timeline

WhenAction
Now to mid-2027List every property’s EPC rating and expiry date. Identify which are already C, which are close and which need major work.
2027Get surveys and quotes for D and E rated homes. Check grant eligibility. Watch for the regulations and final C threshold.
2027 to 2028Carry out work on properties near C first, then lodge new EPCs before 1 October 2029 to lock in compliance.
2028 to 2029Tackle harder properties. Keep invoices and evidence of spend for the cost cap.
By 1 October 2030Every private let compliant or covered by a registered exemption.

Keep every invoice and installer certificate from 1 October 2025 onwards. If you hit the cap, you will need to prove it. Our planned guides to D to C upgrades and grants for landlords will help you price the work.

How to prioritise a portfolio

Most landlords with more than one property cannot upgrade everything at once. Sort your homes into four groups and work through them in order.

  1. Already C or above, EPC lodged: note the expiry date. If it falls after 1 October 2029, you may already have certainty until expiry.
  2. High D: often a small number of measures away from C. These are your quickest wins before the October 2029 cut-off.
  3. Low D and E: need a survey and a costed plan. Check grant eligibility early, as third-party funding counts towards the cap.
  4. F or G: already below today’s legal minimum. Deal with these now, whatever happens to the 2030 rules, or register a valid exemption.

Record the EPC rating, expiry date, spend to date and planned measures for each property in one place. That record becomes your evidence if you later rely on the cost cap or an exemption.

Working with tenants on upgrades

Many energy measures need access, and some need the tenant’s consent. Under the confirmed policy, a refusal of consent by a tenant, superior landlord or planning authority can support a third-party consent exemption.

Plan works for void periods where you can. Where a tenant is in place, explain the benefit in writing, agree dates and keep a record of every request. Lower bills and a warmer home are a strong case, and the record protects you if consent is refused.

What is still unknown

Be clear about the gaps. As of the January 2026 response, these points were not settled:

  • the exact C threshold on the new EPC metrics;
  • the final wording of the regulations and the primary legislation they depend on;
  • whether a portfolio-based cost cap will be introduced;
  • how long the current Energy Efficiency Rating will stay on reformed EPCs as a legacy metric.

None of this changes the direction of travel. Plan for C by October 2030 and adjust the detail as the law is published.

What this means for your other compliance

EPCs do not sit on their own. England’s PRS database, opening from 15 December 2026, asks for EPC details for every registered property alongside gas and electrical safety evidence. See the documents needed for landlord registration.

The Decent Homes Standard will apply to private rented homes from 2035. Planning fabric upgrades now can also address damp and condition issues before then. Our landlord compliance checklist brings these duties together.

Wales

Wales is covered by the same amended regulations. The January 2026 response gives no separate Welsh timeline or threshold.

Frequently asked questions

Do landlords need EPC C by 2030?

Not yet as a legal requirement. The current minimum for covered private rentals in England and Wales is EPC E unless a valid exemption applies. Government intends a higher standard by 1 October 2030. Use the announced metrics and cost cap for planning pending legislation. The planned standard is EPC C on new metrics.

What is the minimum EPC rating for a rental property today?

E. Properties rated F or G cannot be let unless a valid exemption is registered.

How much will landlords have to spend?

The confirmed cap is £10,000 per property, or 10% of value for properties worth under £100,000. The government estimates average spend at around £5,400.

Does work I have already done count?

Relevant measures installed on or after 1 October 2025 count towards the cap. Keep invoices and certificates.

Is there an earlier deadline for new tenancies?

No. The proposed 2028 date for new tenancies was dropped. All tenancies work to 1 October 2030.

Will my current EPC C still count?

If it is rated C or above on the current rating and was lodged before 1 October 2029, it stays compliant until it expires or is replaced.

Do I need a new EPC before starting upgrade work?

Under the confirmed policy, landlords without a qualifying EER C lodged before 1 October 2029 will need a new EPC before works and a post-retrofit EPC to show compliance. Reasonable EPC costs count towards the cap.

Does the 2030 rule apply in Scotland?

No. These rules cover England and Wales. Scotland has its own regime.

Know where every property stands on the road to C

ORBIT scores each property’s health and tracks EPC ratings and expiry dates. Enter certificate expiry dates in ORBIT and configure reminders. It is included in every TLA membership tier. Compare landlord associations before you choose.

Check property health in ORBIT Documents needed for registration

Keep reading

Browse all landlord guides in the Knowledge Base

This guide is general information, not legal advice.